CURRENT PROJECTS
|
 |
CURRENT PROJECTS
|
The name and the characteristic of object |
Date of the beginning
|
The kinds of works executed by own forces |
Pipe-bend from the town of Kaljazin O337 mm, L=78
km
|
2005 |
Preparatory works, excavations, installation of
equipment and pipelines, insulation and laying, civil engineering
and finishing, electrochemical protection |
Gas main "SRTO-Torjok" (the Vologda area)
km 2000- km 2053,56 O1420mm, L=53,6 km |
2004 |
Preparatory woks, excavations, installation of equipment
and pipelines, insulation and laying, civil engineering and
finishing, electrochemical protection |
Gas main Suguer-Hadjeret-Yennus (Algeria) O 42 "
L=161 km |
2005 |
Welding, installation of equipment, insulation and
laying |
The main oil pipeline "The Eastern Siberia -
the Pacific Ocean " O1067 mm, l=30 km |
2006 |
Welding, installation of equipment, insulation and
laying |
|
 |