HISTORY |
 |
BUILDING
PROJECTS |
Name and short description of the project, special
conditions of work |
Customer
(name, location, telephone) |
Period of work |
Candidate
Scope of work in the project, thousand rubles |
Kind of work
done by own resources |
Date of the beginning |
Date
of the completion |
Scope
of work in general contract (if any),thousand rubles |
Scope
of work done byown resources, thousand rubles |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
Experience
in building and construction works |
Oil and gas collection in PS Yurubchensky field,
DU 530Ø 530 , L =1.8 km (Krasnoyarsk region) |
"Rosneftegazstroy",
Moscow, Jitnaja str.,
14, b.1 |
1999 |
2000 |
5332 |
5332 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing |
Mozyr-Brest oil pipeline, DU 720, 720 Ø, L=10.8
km (Belarus) |
JSC
“STORY-TRANS-GAZ”, Orjol, Moskovskaja str., 29tel.332-91-57 |
1999 |
2000 |
4362 |
4362 |
nstallation
of equipment and pipelines,insulating and laying |
Reconstruction of Kuybyshev-Lisichansk oil pipeline,
DU1220, 1220 Ø, L=16 km (Rostov region) |
JSC
“STORYNEFT'”, Samara, Frunze str., 117tel.950-84-50 |
2000 |
2001 |
13519 |
13519 |
installation
of equipment and pipelines |
Section ‘Peregrebnoye Punga-Ukhta’, km 980-1003 Ø
1420, L=22.3 km. |
YAMAL-GAZ-INVEST,
Moscow,
Vernadskogo prospekt,41tel.
355-99-64 |
1997 |
2001 |
218983 |
218983 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
SRTO-Torzhok gas pipeline, Ø 1420, km1150-1172,6
(22 km) |
DSG
of Ukhta, Uhta, republic Komi,
postbox-98,tel.
6-09-87 |
1997 |
1999 |
181550 |
181550 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Gorky-Center-Serpukhovskaya gas pipeline L=480 m,Ø
1200 (basic and reserve lines) L=41 km, river-bed of r.Oka,
traditional method |
MOS-TRANS-GAZ,
Moscow region,
Leninskij district, Kommunarkatel.
428-93-30 |
1996 |
2001 |
97935 |
85000 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Yelets-Novopskov gas pipeline Ø1220 mm L=53
km, river-bed of r.Potudan' (basic L=300m and reserve L=270m),
traditional method |
MOS-TRANS-GAZ,
Moscow region,
Leninskij district, Kommunarkatel
.428-93-30 |
1997 |
2000 |
470735 |
430500 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnica
l work and electro-chemical protection(ÝÕÇ) |
Gas pipeline Long-Yugan-Salekhard,Ø1020 mm
L=5,6 km |
JSC
"Nadimspetssvarmontaj" Nadim, tel.8-34- |
2000 |
2000 |
8358 |
8358 |
installation
of equipment and pipelines |
Yamal-Europa gas pipeline,Ø 1420 mm, L=44km
(Belarus) |
JSC
“STORY-TRANS-GAZ”, Orjol, Moskovskaja str., 29tel.332-91-57 |
1997 |
2002 |
402622 |
351104 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Russia-Turkey gas pipelineØ1420 km L=27 km(Stavropol
region) |
JSC
“STORY-TRANS-GAZ”, Orjol, Moskovskaja str., 29tel.332-91-57 |
2000 |
2002 |
273337 |
247889 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Kenkiyak-Atyru, Kazakhstan,Ø 611mm, L=120
km |
JSC
“STORY-TRANS-GAZ”, Orjol, Moskovskaja str., 29tel.332-91-57 |
2002 |
2002 |
247114 |
137975 |
preparation,
excavation,installation of equipment and pipelines,insulating,laying |
Gas pipeline "Samsun-Ankara" (Turkey)28-198
km, Ø1420mm,L=170 km |
JSC
“STORY-TRANS-GAZ”, Orjol, Moskovskaja str., 29tel.332-91-57 |
2000 |
2001 |
22320 |
2320 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Oil pipeline ÁÒÑ-3Ø 1000,L=103,7 KmNeva river,Microtunnel
method |
JSC
"Stroyneft" Moscow, Dobrolyubova
st. 61\1 tel.332-73-15 |
21.05.2003 |
25.10.2003 |
1528837 |
777818 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing,electrotechnical
work and electro-chemical protection(ÝÕÇ) |
Construction
of gas collectors in Zapolyarye NGKMØ325, 426, 57 L=110
km |
JSC“STORY-TRANS-GAZ”
Orel, Moskovskaya st.29, tel.332-91-57 |
2001 |
2002 |
615311 |
484115 |
preparation,
excavation,installation of equipment and pipelines,insulating,
laying,building and finishing |
Construction of internal production collector in
Zapolyarye NGKMØ 1400, L=12 km |
JSC“STORY-TRANS-GAZ”
Orel, Moskovskaya st.29, tel.332-91-57 |
2001 |
2002 |
254923 |
223918 |
installation
of equipment and pipelines,insulating,laying |
Haud-El-Hamra-Arzev oil pipelineOZ-2,Ø900
mmL=262km |
JSC
“STORY-TRANS-GAZ” Orel, Moskovskaya st.29, tel.332-91-57 |
2002 |
2003 |
292428 |
292428 |
preparation,
excavation,installation of equipment and pipelines |
Gas pipeline "SRTO -Torjok" (Vologda region)2053-2089
km, Ø1420mm,L=36 km |
JSC“STORYTRANS-GAZ”
Orel, Moskovskaya st.29, tel.332-91-57 |
2004 |
2005 |
245000 |
15180 |
preparation,
excavation,installation of equipment and pipelines,insulating
works,laying,building
and finishing,
electro-chemical
protection(ÝÕÇ) |
Overall repairs of the gas pipeline "Urengoj-Centre-1"
2346-2356 km (Chuvash region), Ø1420mm,L=10 km |
Limited
Company "Volgatransgaz" JSC "GAZPROM" |
2004 |
2005 |
30000 |
18440 |
insulating
sheath repairs, insulating and laying works |
Overall repairs of the gas pipeline "Torjok-Minsk-Ivatsevichi"
178,8-185,2 km (Smolensk region), Ø1220mm,L=7 km |
Federal
State Unitary Company (ÔÃÓÏ) "Construction society"
Limited Company "Lentransgaz" |
2004 |
2004 |
55000 |
30100 |
preparation,
excavation, dismantling and installation
of pipelines, quality control, insulating works,
laying,building and electro-chemical protection(ÝÕÇ) |
Construction of the gas pipeline "Pochinki-Izobilnoje"
Ø1400mm, 22 km |
Limited
Company "FAB-Vostok" Fernleitungs -und -Anlagenbau/Vostok |
2004 |
2005 |
17250 |
7615 |
Welding
and assembly works (CRC), building and
construction works quality
control |
Overall repairs of the gas pipeline "Urengoj-Centre-1"
2083-2089 km (Tatar region), Ø1420mm |
JSC“STORYTRANS-GAZ”
Orel, Moskovskaya st.29, tel.332-91-57 |
2005 |
2005 |
44557 |
44557 |
insulating
sheath repairs, insulating and laying works |
Current projects |
Pipe-bend from the town of Kaljazin Ø337 mm,
L=78 km |
The
capital construction department of Open Company Severgazprom,
r. Komi, Ukhta, glavpochtamp p.o.-98 |
2005 |
until
the present time |
34848 |
29183 |
Preparatory
works, excavations, installation of equipment and pipelines,
insulation and laying, civil engineering and finishing, electrochemical
protection |
Gas main "SRTO-Torjok" (the Vologda area)
km 2000- km 2053,56 Ø1420mm, L=53,6 km |
Open
Society Strojtransgaz,Moscow str., 29 tel.332-91-57 |
2004 |
until
the present time |
33629 |
320970 |
Preparatory
woks, excavations, installation of equipment and pipelines,
insulation and laying, civil engineering and finishing, electrochemical
protection |
Gas main Suguer-Hadjeret-Yennus (Algeria) Ø
42 " L=161 km |
Open
Society Strojtransgaz,Moscow str., 29 tel.332-91-57 |
2005 |
until
the present time |
107100 |
107100 |
Welding,
installation
of equipment,
insulation and laying |
The main oil pipeline "The Eastern Siberia -
the Pacific Ocean "Ø1067 mm, l=30 km |
Open
Society AK Transneft Russia, 119180, Moscow, Bolshaya poljanka
str., 57. |
2006 |
until
the present time |
472000 |
472000 |
Welding,
installation of equipment, insulation and laying |
The total experience of works
on pipeline transport construction - 36 years |
|
 |